Wilmington Hospital HVAC Upgrades Phase VI

Contract Amount: $700,000
Wilmington, Delaware
Owner: Christiana Health Systems
Customer: The Whiting-Turner Contracting Company

This project consisted of renovations to the fourth, fifth and eighth floors (patient rooms, non-invasive lab and mechanical room) along with exterior duct trunk lines to feed these and other floors. The work also included the installation of a 5-section rooftop air handling unit with pre-fabricated penthouse enclosures. All work had to be diligently scheduled and coordinated with numerous construction trades and the various departments within the hospital, as portions of this project involved both patient transfer and occupant protection. The use of a 550 ton crane was required to hoist the air handling unit section, and required an assist crane to construct it the evening before the scheduled lift. Approximately 20 people were involved in the actual lift and were positioned on the roof, on the ground and those monitoring safety/traffic controls. This project required approximately 15,000 lbs. of sheet metal ductwork which was fabricated in Delcard’s sheet metal shop.